Nec4: Effective Preparation And Management Of The Construction Programme

de Tim (Irwin Mitchell, Uk) Willis 

Bertrand.pt - Nec4: Effective Preparation And Management Of The Construction Programme
idioma: Inglês
Editor: Emerald Publishing Limited
Edição: fevereiro de 2025
Portes
Grátis
10%
74,35€
66,92€

NEC4: Effective Preparation and Management of the Construction Programme explains the critical role of the programme within the NEC4 suite of contracts, providing insight and guidance into NEC4 contract requirements and good practice in the preparation of planning the works and the programme.

Nec4: Effective Preparation And Management Of The Construction Programme
de Tim (Irwin Mitchell, Uk) Willis 
ISBN:
9781836624813
Ano de edição:
02-2025
Editor:
Emerald Publishing Limited
Idioma:
Inglês
Dimensões:
171 x 248 x 8 mm
Encadernação:
Capa mole
Páginas:
140
Tipo de Produto:
Livro
EAN:
9781836624813
X
O QUE É O CHECKOUT EXPRESSO?

O ‘Checkout Expresso’ utiliza os seus dados habituais (morada e/ou forma de envio, meio de pagamento e dados de faturação) para que a sua compra seja muito mais rápida. Assim, não tem de os indicar de cada vez que fizer uma compra. Em qualquer altura, pode atualizar estes dados na sua ‘Área de Cliente’.

Para que lhe sobre mais tempo para as suas leituras.